|
Build Your Online Product Catalogs?
Product Name: |
High quality safety steam boiler, stable and secure for sale
|
Supply Ability: |
|
Related proudcts |
|
Specifications |
Industrial stem boiler with high quaility |
Price Term: |
FOB |
Port of loading: |
Shanghai or Qingdao |
Minimum Order |
1 set |
Unit Price: |
35000 $ |
|
In order to ensure safe and economic operation of the boiler, ensure the personal safety, boiler operating personnel must strictly carry out the relevant regulations and procedures of steam boiler safety technology supervision. The Preparation of before Start oil and gas boiler: Internal and external inspection: confirm the boiler body, burning machine, accessory equipment in good condition; safety accessories, each valves and instrument are flexible and stayed accurate location. Check the line voltage reach the requirements or not, all kinds of switch is normal, start the pump, combustion engine fan, pumps and other auxiliary respectively to see operation is normal or not. Feed water into boiler: open the drain valve to make the water level up to the normal water level(slightly below the water level) Begin to Operate: Oil and gas boiler is the program to start. Press the start button on the control ark and the combustion engine fan motor begin the programmed-start. First step is furnace purging about 2 minutes and then automatic ignition and stable combustion. After the ignition, the worker should adjust combustion according to the required amount of load and them boiler operates normally. The operator should monitor the water level change closely in the process of operation to prevent water shortage accident or filled with water accident. Boosting Pressure: When the steam pressure rises to 0.05-0.1***, worker should flush water gauge. When the steam pressure rise to 0.1-0.15***, worker should flush the trap tube of pressure gauge. When steam pressure rises to the rated working pressure, the newly installed boiler safely valve and the relief valve after repaired should be debugging in accordance with the relevant provisions and seal. The relief valve during the validity period of maintenance should take discharge test. Warm Tube and Make two Boilers Work Together: In order to prevent the steam supply producing water hammer, warm tube should be done before steam supply, it will take when s |
Company: |
Xinda boiler container Co.,Ltd
|
Contact: |
Mr. Adam Wang |
Address: |
The south of Jinsui Road |
Postcode: |
|
Tel: |
86 373 2511868 |
Fax: |
86 373 5591968 |
E-mail: |
|
|
|
|